It was worth the 12 weeks wait - Printable Version +- (https://bigbluetrains.com) +-- Forum: Mainline (https://bigbluetrains.com/forumdisplay.php?fid=17) +--- Forum: N/Z and Smaller Modeling (https://bigbluetrains.com/forumdisplay.php?fid=20) +--- Thread: It was worth the 12 weeks wait (/showthread.php?tid=535) |
It was worth the 12 weeks wait - Fatso - 01-13-2009 :hey: Two of my kato europwan high speed traind arrived today the british eurostar and a french one heres a few pics Re: It was worth the 12 weeks wait - Tom - 01-13-2009 Those are COOL. I wonder if something similar is what the State of California here has in mind for the "High Speed Rail" route they want to build? I once saw someone paint a TGV model into a Silver and Orange Sacramento Northern scheme since it was an interurban back in the day. Pretty neat actually. Re: It was worth the 12 weeks wait - Sarge - 01-13-2009 Those are pretty cool Re: It was worth the 12 weeks wait - Biased turkey - 01-14-2009 Very impressive. I envy you because I'll never be able to run such nice TGVs on my 23" X 36" oval layout with 9" 3/4 radius curves. Jacques Re: It was worth the 12 weeks wait - Cannonball - 01-14-2009 Careful! You'll poke an eye out with those things! :mrgreen: Sharp looking trains, man. I'd like to see those babies running. Re: It was worth the 12 weeks wait - Jesso - 01-14-2009 Jacques, Kato makes their stuff to run on fairly tight curves, my SD70m's run without a problem on 9 3/4, I think Herc has run SD90's on 9 3/4. Plus I bet they launch off of tight curves really nice at really high speeds . Re: It was worth the 12 weeks wait - scubadude - 01-14-2009 Mike, Nice stuff, I'm sure it was worth the wait. Do you and your son still have the website?? I forgot the address. Re: It was worth the 12 weeks wait - tetters - 01-14-2009 Oooo...those are slick! Re: It was worth the 12 weeks wait - Herc Driver - 01-14-2009 Those are beautiful! Wow, they really look good. If they'd run on 9.75 inch curves - I'd seriously consider getting them too just 'cuz they look so good. (And yes....Kato makes even the SD90's run on 9.75 curves so maybe there's a slim chance these passenger trains would too. Granted, there's a pronounced overhang that's not prototypical, but oh well, I can live with it.) Re: It was worth the 12 weeks wait - Wiredup - 01-14-2009 damn those are dead sexy! I want some for my own layout (how unprototypical would that be? Euro high speeds traveling in the mountains alongside Canadian steamers...) Re: It was worth the 12 weeks wait - Fatso - 01-15-2009 Hi new website coming soon new track plan will more of a german feel to it as i have bonn station built with 5 line coming into it to hold the 5 main european high speed train also have nice kibri castle built and karlsbebege station with 6 lines going in and outplus ice 3 german high speed loco al in N SCALE |