08-06-2020, 08:25 AM
Hello,
o.k. Wayne i see you are going serial.
More brake stuff. Brackets and platform are also surplus from Tichy kits.
As i forgot to make a passage for the retainer valve plumbing, don't worry and built this part in two pieces. One upon the platform and one below. And if nobody knows ...
The brake shaft is longer than it will be needed. Cutting is easy.
There is still this da...d askew grab iron.
Corrected.
There is always the question of the "right" weight of an car. As i prefer 3-point suspensions, there is no need to overweight the car. A stable ride is guaranteed and rocking fron side to side is eliminated. So those two old nuts will do it for the purpose.
At least "Zwangsmaßnahmen" (coumpulsory measures) were taken to fit the roofs. Overnight hardening of course.
Lutz
o.k. Wayne i see you are going serial.
More brake stuff. Brackets and platform are also surplus from Tichy kits.
As i forgot to make a passage for the retainer valve plumbing, don't worry and built this part in two pieces. One upon the platform and one below. And if nobody knows ...
The brake shaft is longer than it will be needed. Cutting is easy.
There is still this da...d askew grab iron.
Corrected.
There is always the question of the "right" weight of an car. As i prefer 3-point suspensions, there is no need to overweight the car. A stable ride is guaranteed and rocking fron side to side is eliminated. So those two old nuts will do it for the purpose.
At least "Zwangsmaßnahmen" (coumpulsory measures) were taken to fit the roofs. Overnight hardening of course.
Lutz