Full Version: Catching Up on My Outstanding Projects
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
Hey guys. Over the past year or so, between The Whistle Post and here, I have accumulatd a number of plans and ideas that have never even left paper. Here is a list of them:
>Yard Office
>Passenger Station for the same
>Roundhouse
>Diesel Service Facility
>2-Stall Car shop
>Engine Shop
>Sand house
>Coal Bunker for our 3 restored steamers
>Diesel fuel Tank
>MoW Truck
>Replacing horn-hooks with Kadee's
>Replacing plastic wheels with metal wheels
>Replacing plastic trucks with metal trucks
>Weathering #21's enginehouse
Enginehouse
>Enginehouse tool shed
>EBT Combine #15
>EBT Paint Shop
>Boney loads
>Crushed limestone loads
>EBT Coal Bunker
>Spirit Train from the game The Legend of Zelda: Spirit Tracks
>Maple Sugaring Plant
>Metal Wheels on all cars
>Roller Bearing trucks on all cars
>Magnetic Knuckle couplers on all cars
>Weathering everything
OUTSTANDING!

357 357

I think we all have a list similar to that!
I knew that I had a few, but I never actually though I had that many projects, now that I look back. I plan on attacking every one of them in a rather systematic order, and then packing them away until I use them.
I am afraid I would get depressed if I made such a list - so I don't! Cheers
Now that you have brought up the subject, I guess I can list things.

(1) work on roadside gas transfer diorama. (2) rest for a few hours. (3) do a little bit more on the rgtd. (4) wait till next day, or next opportunity. (5) think about what to do next on the rgtd. (6) maybe work on it or rest first (7) (continue on ad nauseam)

I wanted to do it as a structure for the summer contest, but I think that ends in September. (I think)

Lynn 357 357