Svein
01-07-2012, 10:50 AM
Well, I guess I'll take the plunge and join the 2012 resolution challenge. I'll probably regret it later on, but at the same time it's a nice kick in the butt to myself to finally getting something done. I realized today that it's been allmost two years (february 2010) since I started building my sectional H0 layout, and I haven't even finished the wiring to the point that the layout is operational..!
So, this will be my 2012 Resolution challenge. I intend to finish all the wiring on all three sections and make the layout operational, and to reach this goal I also need a control panel which will be built and wired accordingly. If time permits, I'll also try to get some basic scenery contours done, and build a temporary staging yard to get trains running, but this won't be my primary goal. All the material needed is allready here (maybe I need some more wire), including a bunch of switches for the control panel (old swithes from a layout I tore down for a friend some years ago, which all need testing and de-soldering first).
Here's my starting point as of today:
One section finished, still need to make the connections to the control panel (the two connection strips in the center of the pic):
I've also raised the water level on this section, it was 2cm too low compared to the other two sections (I decided to raise the water level after this section was built):
The second section has a bunch of loose wires underneath, and some leftover temporary connections from testrunning the layout a year (!) ago. I also have to connect a turnout motor and accessory switch to one of the turnouts (upper right in the pic):
The third section is the one I've started on today, still just a bunch of loose wires:
Svein
So, this will be my 2012 Resolution challenge. I intend to finish all the wiring on all three sections and make the layout operational, and to reach this goal I also need a control panel which will be built and wired accordingly. If time permits, I'll also try to get some basic scenery contours done, and build a temporary staging yard to get trains running, but this won't be my primary goal. All the material needed is allready here (maybe I need some more wire), including a bunch of switches for the control panel (old swithes from a layout I tore down for a friend some years ago, which all need testing and de-soldering first).
Here's my starting point as of today:
One section finished, still need to make the connections to the control panel (the two connection strips in the center of the pic):
I've also raised the water level on this section, it was 2cm too low compared to the other two sections (I decided to raise the water level after this section was built):
The second section has a bunch of loose wires underneath, and some leftover temporary connections from testrunning the layout a year (!) ago. I also have to connect a turnout motor and accessory switch to one of the turnouts (upper right in the pic):
The third section is the one I've started on today, still just a bunch of loose wires:
Svein