Full Version: The Credit Valley Railway circa 1900
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
Pages: 1 2 3 4 5 6 7 8
Wow, the year is flying by.

Let's see what I have accomplished...

Well, March and April have been written off as far as the CVR is concerned as I was assisting with the MC&H Central, a display layout in our shop. <!-- m --><a class="postlink" href="http://www.muskokacomputes.com/Shop-Layout.html">http://www.muskokacomputes.com/Shop-Layout.html</a><!-- m -->

As for the CVR, let's check the current "To Do" list:

1. Put decoders in 6 locomotives.

2. Two locomoives to bash into one.

4. Check couplers and weight on 12 pieces of rolling stock (and counting).

5. An 18cm high by 62cm long trestle to build.

6. About 34 structures to build (so far).

7. Scenery to do on a 5.3sq metre layout.


Hmmm!!!

Very little changed, except I did check out about 24 pieces of rolling stock and clear them for use on the CVR.
That's what makes this such a great hobby - always a few things to be done. Err... a TON of things to be done. Stay with it, Will! Big Grin
Gary S Wrote:That's what makes this such a great hobby - always a few things to be done. Err... a TON of things to be done. Stay with it, Will! Big Grin

yeah, if you don't have anything left to do, it's time to tear down and start over Icon_lol
Right you are Gary. Kevin beleive it or not, yesterday I was thinking and measuring to see if I could make a change or two and have a second level. I was thinking on doing the Cataract to Elora Branch.

Only way I think it could be done is to go down, but that would make the lower level too low and I do not think I would be able to raise the existing layout 45cm without alot of hassle, so I will leave it the way it is.
Will: are you on the layout tours for the G8 meeting? Worship 790_smiley_picking_a_fight Worship 790_smiley_picking_a_fight Worship
No David, my home layout is not finished enough and they said the shop, located between two lawyers offices was not in a secure enough area. Icon_lol
Hi Will!
I haven't been around the RR forums for a while...
Good to see you & the CV again!
You've sure made a lot of progress since the last time I caught up with you! Thumbsup
Sandwiched between two lawyers..?? You indeed are in danger.... Eek
Thanks Drew
Yes Gus, you are correct, and the one on my right is going into politics. Eek
Uuuff...that's a triple threat...... Goldth
Trouble, yes, but not as much trouble as you would have if the one on the left was going into politics! Goldth 357 Icon_lol
I will be moving from my apartment to a house, so I am having to tear down the existing Credit Balley Layout and will be starting over.

The new location will be a little larger, going from a 3M x 3M space to a 3M x 5.5M space. With the extra space, I am planning a pyramid helix (from an article in N Scale Magazine). The second level will consist of the branch line from Cataract to Elora.

The layout is coming down now, the move will be in June and plans will start soon after for building the new benchwork.
Hi Will,

Glad to see you back! Sounds like good news too...?! Tearing down is hard, but the move to a bigger space and addition of branchline sounds fantastic!

Cheers,

Andrew
Will , Robin and I wish you the best in the new home and I am sure the layout will be fantastic!!

Mike
I think we are finally moved in and I am ready to start a new layout. Here is the new train room.

Photo #1. Looking in from the walkin door from the outside. Photo #2. Desk and workbench (note: magazines will be moved to shelfing unit.

[Image: CVR-L144_Thumb.jpg] [Image: CVR-L144_Thumb.jpg]

Photo #3. Looking at the 4.75m wall. Photo #4. Looking at the 3.1m wall.

[Image: CVR-L145_Thumb.jpg] [Image: CVR-L146_Thumb.jpg]

Photo #5. Looking at the 3.65m wall. Photo #6. Wood all cut for the benchwork.

[Image: CVR-L147_Thumb.jpg] [Image: CVR-L148_Thumb.jpg]

Note that the entire room is painted blue, even the ceiling.

You can see full size photos on the website:
<!-- m --><a class="postlink" href="http://www.muskokacomputes.com/CVR-Layout-01.html">http://www.muskokacomputes.com/CVR-Layout-01.html</a><!-- m -->

__________________
Pages: 1 2 3 4 5 6 7 8