![]() |
|
Wickmans Layout Journey - Printable Version +- (https://bigbluetrains.com) +-- Forum: Mainline (https://bigbluetrains.com/forumdisplay.php?fid=17) +--- Forum: HO Modeling (https://bigbluetrains.com/forumdisplay.php?fid=21) +--- Thread: Wickmans Layout Journey (/showthread.php?tid=7188) Pages:
1
2
|
Wickmans Layout Journey - LynnB - 11-16-2014 This will be an on going documentaion for my new layout. I took down the old layout in jan 2014 and spent quite a bit of time designing the new layout plan. With my past layout I learned alot about what I liked and this newest layout has alot of the old layouts. The new layout has more space from a adjacent room to give added train running. It is a loop to loop with each loop having automation so when a train comes upto a closed turnout it will automaticly open. I'm also attemping to have switching opportunity's. I'm using a digitrax super chief, peco turnouts with tortoise motors controlled by ds64 stationary decoders. The benchwork is open grid type. One thing I did want was the benchwork to be higher so I raised it to be 50 inch at grid level. You can see the plan posted here is pretty much accurate but is also only a suggestion for industry spurs as these can easy be added as I go. ![]() I won't bore you's with the disassembly of the old layout, what a mess that was.I had taken pics of the new benchwork laid out in the old room. ![]() ![]() ![]() ![]() The benchwork is put up and old mountains put in place, the mountains will be raised higher as I go. ![]() ![]() ![]() ![]() ![]() ![]() Here is the benchwork in place and railbed for the mainline was routed and sat on the benchwork until I could get the elevations the way I thought would work best. Starting from the new room and working my way into old room. ![]() ![]() ![]() ![]() ![]() ![]()
Re: Wickmans Layout Journey - LynnB - 11-16-2014 First chance I got I started raising the roadbed but there were many changes to be made as my new ideas began to come into play.I wanted a layout that the track would raise and lower with industry spurs , bridges rivers,wharf scene and a tunnel to start with. ![]() ![]() I placed a couple of the dios where I thought they would work and cut them into place. ![]() ![]() ![]() ![]() All the elevations has to flow in unison, this was a chore. It was time to cut a river in for the old waterfall.
Re: Wickmans Layout Journey - Tyson Rayles - 11-17-2014 Wow, great progress! Re: Wickmans Layout Journey - faraway - 11-17-2014 Lots of space and a great bench work. I like the idea to save parts of the old layout and place them on the new one. Speeds things up and gives a good impression where you are going to. Re: Wickmans Layout Journey - LynnB - 11-17-2014 Thanks Mike and Reinhard. Having a bit of a time putting together a timeline to where I'm at now but I'm wittling away at it. Re: Wickmans Layout Journey - LynnB - 11-17-2014 Needed a couple bridges to cross the river. A bit of plaster to fill the holes. ![]()
Re: Wickmans Layout Journey - LynnB - 11-17-2014 More plastercloth for the tunnel and a few ideas for structures. ![]() ![]()
Re: Wickmans Layout Journey - LynnB - 11-18-2014 The gorge to the river are sceniced. The bottom of the river can actually be seen again. ![]() ![]() ![]()
Re: Wickmans Layout Journey - LynnB - 11-18-2014 Made all the white go away.and the roadway upto the hill is roughed in. ![]() ![]() ![]()
Re: Wickmans Layout Journey - LynnB - 11-18-2014 Every so often as I'm working through the disaster I feel the need to tiny, believe it or not. I got around to getting the stationary decoder board hung from the benchwork, nice and neat.
Re: Wickmans Layout Journey - LynnB - 11-18-2014 Filled in the bridge area to left of hill.
Re: Wickmans Layout Journey - LynnB - 11-18-2014 Had a few different ideas for the hill area. ![]() Another idea ![]() Did a bit of photoshop to get the right perspective. ![]() Building up the elevations for the scene. ![]() A splash from ground goop ![]() The finished scene
Re: Wickmans Layout Journey - LynnB - 11-18-2014 Before I can install any bridges the area close to the bridges needed to be built up , work back to front right? ![]()
Re: Wickmans Layout Journey - LynnB - 11-18-2014 I made up new water for the old waterfalls as I did care much for the ws watereffects water falls. I simply took clear silicone and made a few long strips with 5 lines each thin using a long screw pulling it together and pulling it downward thinning it out. This was done on a tote plastic lid, let it set for a few days and pulled them off. This is actually two strips one ontop of the other. ![]() And more scenery completed down the line, more ground goop. ![]() ![]()
Re: Wickmans Layout Journey - Twist - 11-23-2014 Hi, wow you made great progress on your layout.It´s nice to see it growing up again and I liked the old version seen somewhere else and will like the new one. keep up the great work, Cheers,Chris |