The M-K & Eastern RR
#33
Graffen:
I checked my inclines with a 2-foot level and pieces of 1/8 x1/4 and 1/16 x ?? wood under one end. I guess a 1/2" piece would give 2%.

I had a problem when I didn't check and through it would be level because all the supports were the same height. Found that the basement floor had a bit of drainage slop built in.
David
Moderato ma non troppo
Perth & Exeter Railway Company
Esquesing & Chinguacousy Radial Railway
In model railroading, there are between six and two hundred ways of performing a given task.
Most modellers can get two of them to work.
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)