Brooklyn 1st Ave waterfront
I drew up another track plan with some more accurate measurements that I took. Ill have to move a light switch and raise the tv thats mounted on the wall but after that i can start building the benchwork. The new plan has a runaround, technically the prototype has a runaround but its used for Brooklyn resource recovery. I also want to use the urban steel overpass kit from Walthers and would need 2 tracks.
[Image: received_275120806732570_zpsj2gemygq.jpeg]

Heres some screenshots of the industries I intend to use.

Going by numerical order in the track plan:
1) Glenwood mason supply (the screenshot has been flipped to a mirror image) they get boxcars of bricks
[Image: 20190416_130711_zpskngpzbu3.jpg]

2) Favorite Plastics, covered hoppers for plastic products
[Image: 20190416_123637_zpszu2pbtma.jpg]

3) Brooklyn resource recovery (foreground of photo), Gondolas for auto scrap
4) Manhattan Beer (background), boxcars of beer
[Image: 20190416_123600_zps7eouprr0.jpg]

5) Brooklyn Terminal Market, refrigerated cars of produce. Cars can be unloaded by forklift or they can be spotted in front of a dedicated lane for trucks to transload
[Image: 20190416_123820_zps1txxd4bc.jpg]

6) CBS Food Products, tank cars of food oils
[Image: 20190416_123729_zpsgmrlbozg.jpg]
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)