I drew up another track plan with some more accurate measurements that I took. Ill have to move a light switch and raise the tv thats mounted on the wall but after that i can start building the benchwork. The new plan has a runaround, technically the prototype has a runaround but its used for Brooklyn resource recovery. I also want to use the urban steel overpass kit from Walthers and would need 2 tracks.
Heres some screenshots of the industries I intend to use.
Going by numerical order in the track plan:
1) Glenwood mason supply (the screenshot has been flipped to a mirror image) they get boxcars of bricks
2) Favorite Plastics, covered hoppers for plastic products
3) Brooklyn resource recovery (foreground of photo), Gondolas for auto scrap
4) Manhattan Beer (background), boxcars of beer
5) Brooklyn Terminal Market, refrigerated cars of produce. Cars can be unloaded by forklift or they can be spotted in front of a dedicated lane for trucks to transload
6) CBS Food Products, tank cars of food oils
Heres some screenshots of the industries I intend to use.
Going by numerical order in the track plan:
1) Glenwood mason supply (the screenshot has been flipped to a mirror image) they get boxcars of bricks
2) Favorite Plastics, covered hoppers for plastic products
3) Brooklyn resource recovery (foreground of photo), Gondolas for auto scrap
4) Manhattan Beer (background), boxcars of beer
5) Brooklyn Terminal Market, refrigerated cars of produce. Cars can be unloaded by forklift or they can be spotted in front of a dedicated lane for trucks to transload
6) CBS Food Products, tank cars of food oils