N-Gauger's 2020 one foot challenge
#1
In G or more accurately 1:20.3.  

https://image.shutterstock.com/z/stock-p...917591.jpg

Something like the building only, No turntable.  2 stalls for engines, tools and work benches.
I'll have to install lead in switches and tracks in addition to building the structure.  It will be made with wood, as most all of my projects.

List - 1st draft:
  • Design building - Done
  • Draw building - Done except for floor details (tools, work benches etc)
  • Decide on materials to build structure - Paint sticks and spare pieces of lumber - Done
  • Build structure 
  • Add switches to layout - Connect air tubes and toggles to operate switch machines - Add position LED lights to switch frogs
  • Add the tracks inside the shed
  • Isolate the 2 tracks electrically and connect "power lead" switches so both engines don't come out at the same time   Goldth
  • Light building - More LED's
~~ Mikey KB3VBR (Admin)
~~ NARA Member # 75    
~~ Baldwin Eddystone Unofficial Website

~~ I wonder what that would look like in 1:20.3???
Reply


Messages In This Thread
N-Gauger's 2020 one foot challenge - by ngauger - 02-23-2020, 07:34 PM

Forum Jump:


Users browsing this thread: 1 Guest(s)