Nantahala Midland V 3.0
#61
Mike,
This is the first time I've seen your whole layout in the raw (at least I think it is).Nice plan except for the tunnel it would work here in Michigan.The only tunnels I know of here go under the Detroit river to Canada.One goes to Winsor and the other to Sarnia.

Anyway Thumbsup Thumbsup Thumbsup :mrgreen:
Johnathan (Catt) Edwards
"The Ol Furrball"

"I'm old school,I still believe in respect"
Reply
#62
The reason for the tunnel is there is a staging track under/behind that ridge. But you could use tall trees to conceal the opening Catt.
Mike

Sent from my pocket calculator using two tin cans and a string
Reply
#63
Keeping the pic of your "naked" layout as inspiration for a future Z scale layout. Eek :mrgreen:
Johnathan (Catt) Edwards
"The Ol Furrball"

"I'm old school,I still believe in respect"
Reply
#64
Looking forward to it Catt!
Mike

Sent from my pocket calculator using two tin cans and a string
Reply
#65
[quoteLooking forward to it Catt!][/quote]

Ok Mike, just don't hold your breath while your waiting because I'm not done playing with the current one. :mrgreen:
Johnathan (Catt) Edwards
"The Ol Furrball"

"I'm old school,I still believe in respect"
Reply
#66
Just for grins I thought I would post the rational behind my railroad, hope this doesn't bore you to much:

The Southern Railway had a branchline going from Asheville (everything is in N.C.) to Murphy, where it interchanged with the L&N. In my time period (1960's) it also interchanged with the Graham County Railroad Company around Nantahala at Bear Creek junction. Where it comes through the area I'm modeling it followed the Nantahala river around the Nantahala mountain range. While I am rewriting history I also re-routed the Southern's line thru Tellico Gap, a natural pass in the middle of the mountain range. Tellico Gap is a real place but in my time period there is nothing there (see what happens when the railroad by-passes you ) which leaves me free to do what I want. This also disconnects the Southern from the GCRC which now means I can have it interchange at Tellico Gap junction. This is important for the operational reasons but also because the GCRC ran a Shay into the 1980's. One of the few times you can have a GP38 leave the yard and a Shay pull into the yard AND it's prototypical. The Atlas N scale shay is a little on the large size but will normally be in the yard by itself so it shouldn't be a problem. My biggest concern is how well it runs and how well it holds up. If either of those things are a problem the CGRC also had a SW7 and I have Life-Like's SW9/12 I can use. My second biggest concern is finding the $$$$$$$$ to buy the Shay!
In the western N.C. and north Ga. mountains coal is not only not king it is the ugly red-headed stepchild. In these parts wood is what drives the economic engines of industry. When logging played out furniture companies, pallet companies and pulp wood yards kept the Southern's investors smiling. And so it is on the Nantahala Midland. Up in Tellico Gap there will be a furniture company and feed company (today's last freight customer ) and down in the gap at the junction will be a pulpwood yard and a pallet company as well as a team track. The NM's mainline runs from the upper right around and down past the yard and into the tunnel at the lower right where (in theory anyway ) in proceeds to the Graham Co./Macon Co. line where it connects to the GCRC, which has trackage rights into the yard. A grand total of around 12 miles.
There will be staging yards (at some point in time ) at the lower right (east) and far left (west). Furniture and pallets were shipped all over the country so they will be going in both directions. Feed and fuel (GCRC) came from the midwest so that traffic will always come and go from the west. All pulpwood always goes east to the papermill in Canton (Southern). I will need a small fleet of boxcars for slave service between the lumber mill in Robbinsville (GCRC) and the pallet and furniture companies in Tellico Gap. Everything else can go most any directon.
While passenger traffic stopped in the late 40's in real life it will continue here. A passenger train was usually just a loco and a couple of coaches or a baggage and a coach which is what I will have as well. I can use the old timetables from the 40's for scheduling the pass. trains and the timetables from the 60's for the freight. While I have relocated the Southern's line geographically the town of Nanthala is very close in mileage to Tellico Gap for timetable purposes. However if this causes any operational problems times can be adjusted but at least it will give me a realistic starting point.
This means the Southern will have 4 trains a day (2 each freight and passenger) coming thru the junction. Also the GCRC will be coming once a day and the NM will make two trips a day plus have to switch the yard for the Southern and the GCRC. Whew! Wears me out just thinking about it!
Icon_lol

Also an overall picture before the land forms where painted showing the temp control panel and a shot of the finished area of the layout which is the far right side.


Attached Files Image(s)
       
Mike

Sent from my pocket calculator using two tin cans and a string
Reply
#67
Good to see your work again tyson. Been a long time.
Torrington, Ct.
NARA Member #87
I went to my Happy Place, but it was closed for renovations.
Reply
#68
Thanks and yes it has. Now that I know about the image display option I hope to stay around.
Mike

Sent from my pocket calculator using two tin cans and a string
Reply
#69
I have been trying to come up with a pallet company building that I like (been going on for longer than I care to say) when I got to this point:


Attached Files Image(s)
       
Mike

Sent from my pocket calculator using two tin cans and a string
Reply
#70
I still wasn't happy and this is where I'm at now. I think this may be the final version.


Attached Files Image(s)
       
Mike

Sent from my pocket calculator using two tin cans and a string
Reply
#71
LIKE IT! Thumbsup Will it be rail served?
Ralph
Reply
#72
Thanks Ralph, yes it will be rail served on the left side in the last picture. That is why I raised the foundation some so it would line up with the floor of a boxcar or flatcar. The loading dock is for trucks as are other doors as well. The reason the roof is crooked by the way is everything is just taped together while I was deciding if I liked it.
Mike

Sent from my pocket calculator using two tin cans and a string
Reply
#73
Big Grin Big Grin Yeah, it only took me about two months to finally decide to build the seaport village and museum, in its final version.
I like the second story "walkover", that's an interesting detail. Thumbsup Thumbsup
We always learn far more from our own mistakes, than we will ever learn from another's advice.
The greatest place to live life, is on the sharp leading edge of a learning curve.
Lead me not into temptation.....I can find it myself!
Reply
#74
Two months would be lighting fast for me Pete, I have been fooling with this for closer to 2 years I think!
Eek Icon_lol
Mike

Sent from my pocket calculator using two tin cans and a string
Reply
#75
Are you going to put an abandoned track where the truck is?
Reply


Forum Jump:


Users browsing this thread: 2 Guest(s)