04-01-2022, 02:57 PM
(This post was last modified: 04-01-2022, 02:59 PM by jim currie.)
worked on the rest of the second floor and thought I'd share the way I layout for windows . i use a fine tipped mechanical pencell to mark the bottom of sash and on vertical siding I just count out the spaces and mark then drill 5 holes inside the marks , using a #11 blade i make a cut between the holes , then finish out with small file . the bottom mark assures that all the windows will line up.
Jim
Jim