Planning new FWWR layout
#79
Been a little while so I thought I might update everybody on the layout, not a lot of speed but some is better than none.

The next phase of road bed was laid. This area represents the end of the line of the Everman Park. This will be for the following industries: Everman Paper, Ft Worth Lumber, Delta Steel and Green Bay Packaging.

[Image: IMG_0207.jpg]
[Image: IMG_0206.jpg]

Track work was also added for the Miller brewery leads:

[Image: IMG_0203.jpg]
[Image: IMG_0204.jpg]

After this track work is completed the last peninsula will be added for the brewery itself.

I also upgraded my Digitrax to radio control, this was huge as I'm a cheap SOB, but it is nice to be able to run trains without pulling all my hair out.

I also added to my ever growing engine fleet. I purchase a GP40-2 from a gentleman from another site. He made RMPX 6411 which the FWWR purchase last year. With a little more detailing work, Tsunami install and some weathering, this will be a nice addition to the layout.

[Image: IMG_0208.jpg]
Wayne Snyder
Creating the Ft Worth Sub - FWWR
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)