02-23-2009, 01:28 PM
Continuing around the layout is the other side of the tunnel from Snow Fork Junction as well as a better view of Heather Ridge. Still a lot of work to do here. I'm not sure what I will do with this section yet. I'll at least finish the hills but beyond that I'm not sure.
CandO7430 (The poster formerly known as IandOFan71)
T. Blackstone,
Division Superintendent,
Ohio Div, Chessie System Railroads
T. Blackstone,
Division Superintendent,
Ohio Div, Chessie System Railroads