New track plan # 2
#28
Quote; Between sessions you could leave a cut of cars on the track coming in or the passing siding which would simulate the railroad bringing a cut of cars for the industries you model and leaving them on that track, and picking up the cut you left to go off the railroad from the previous night. You send you locomotive out to pick up the cut of cars, and switch out your industries. The empties that were unloaded locally and loads that were loaded by local industries are then assembled into a cut and left on that "interchange track" to be picked up the next night by the regular turn which will take those cars off the layout and leave another set of cars for your busy railroad to sort to the various industries at the next operating session.; End quote

Russ, if I am reading this right I would not even need any type of yard, is that correct?
Never mind. I figured out I would need some way to sort the cars for the days run.

Loren
I got my first train when I was three,
put a hundred thousand miles on my knees.
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)