NY&A ISL
#17
Bench work started just need to pick up foam, the legs have wheels for easy maneuverability. I will be able to store the removable extension underneath across the leg braces. Slowly chipping away.
[Image: imagejpg1_zpse1193016.jpg]

I was messing around with the track plan and didn't think it made sense to keep siding number 4 a warehouse because I dont know how a building flat will look right at the edge of the layout. So in this plan sidings 1, 2, and 5 stay the same, number 4 is a team track and number 3 will be staging for the front loader at kings material to pull stone cars in the yard (passed the edge of the layout) and push them back when empty.
[Image: 73e9a2af-e923-4937-923a-aacc3756dc93_zpse4dc1e76.png]
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)