06-19-2014, 09:02 PM
Don:
You should read some of the threads about Hornby. They recently came up with what they called "Design Clever" which meant that their RTR models moved back from separately applied details to moulded on the roof (or boiler) details.
You should read some of the threads about Hornby. They recently came up with what they called "Design Clever" which meant that their RTR models moved back from separately applied details to moulded on the roof (or boiler) details.
David
Moderato ma non troppo
Perth & Exeter Railway Company
Esquesing & Chinguacousy Radial Railway
In model railroading, there are between six and two hundred ways of performing a given task.
Most modellers can get two of them to work.
Moderato ma non troppo
Perth & Exeter Railway Company
Esquesing & Chinguacousy Radial Railway
In model railroading, there are between six and two hundred ways of performing a given task.
Most modellers can get two of them to work.
