06-20-2014, 07:18 PM
The foam is glued down, I took some measurements and placed a few lengths of track down to get an idea of how it will all fit.
These 2 sidings are the food processor and paper products industries. The food processor will get a tank car of corn syrup and a boxcar of other ingredients then will get switched with a refrigerated boxcar for outbound packaged frozen food.
The siding with the 3 boxcars will be a warehouse and the siding with the covered hopper will be a team track, in between those will be the runaround track and a staging track for kings material stone hoppers.
I need to pick up some turnouts and I should be on my way.
These 2 sidings are the food processor and paper products industries. The food processor will get a tank car of corn syrup and a boxcar of other ingredients then will get switched with a refrigerated boxcar for outbound packaged frozen food.
The siding with the 3 boxcars will be a warehouse and the siding with the covered hopper will be a team track, in between those will be the runaround track and a staging track for kings material stone hoppers.
I need to pick up some turnouts and I should be on my way.