06-21-2014, 12:22 PM
Im looking to have a 2 track mainline that are 2 inches apart from the center of the ties with a runaround/crossover, what number turnouts would i need to keep the mainline tracks 2 inches apart? I have some extra #5s and thought about cutting back the curved track on both ends but doesn't seem like that will work.
