08-30-2014, 06:44 AM
Not yet, but it shouldn't be a problem. If it would work out at too sharp a gradient then I will simply start the gradient on the rear track of the hidden siding at the back of the top level.
That will give the gradient an extra 10 feet of run.
That will give the gradient an extra 10 feet of run.