09-09-2014, 07:06 PM
Hi there,
thanks for the nice comments.I´m very busy with my job so it´s so little time for the hobby.But I started a more or less big rebuild of some part of the layout.The area I´m talking about is the Tremblay elevator and siding....
below that area and the helix was a return loop with a hidden siding but it doesen´t work right.So I made some plans to develop a 6 track staging below Chetwynd yard.The entrance to that yard will be the loop below the helix.So I ripped the track out,removed the wood and made some changes to the benchwork.
On top of it will be another change.No more elevator and other buildings.It will be Sundance Siding.More pictures will follow as I´ll preoceed....
Thanks for looking,
Cheers,Chris
thanks for the nice comments.I´m very busy with my job so it´s so little time for the hobby.But I started a more or less big rebuild of some part of the layout.The area I´m talking about is the Tremblay elevator and siding....
below that area and the helix was a return loop with a hidden siding but it doesen´t work right.So I made some plans to develop a 6 track staging below Chetwynd yard.The entrance to that yard will be the loop below the helix.So I ripped the track out,removed the wood and made some changes to the benchwork.
On top of it will be another change.No more elevator and other buildings.It will be Sundance Siding.More pictures will follow as I´ll preoceed....
Thanks for looking,
Cheers,Chris
Building the BC-Rail Dawson Creek Subdivision in H0 scale http://bigbluetrains.com/forum/viewtopic.php?f=46&t=7835