01-13-2015, 05:42 AM
Andrew,I would operate that layout as a point to point short line. I would start the day by picking up cars off the interchange and then proceed making up my train in yard A and would head clock wise out of the yard and would make two laps before switching the first industry and make 2 or 3 before switching the next industry in line.I would turn my train at yard B and switch Hersey on the return trip.I would put the outbound cars on the interchange track before tying up for the day.
I would use the tracks to Toronto and Ottawa as my interchange tracks and of course yards A and B are the same but,its being used as two separate yards--that's a old school operating thing.
I would use the tracks to Toronto and Ottawa as my interchange tracks and of course yards A and B are the same but,its being used as two separate yards--that's a old school operating thing.
Larry
Engineman
Summerset Ry
Make Safety your first thought, Not your last! Safety First!
Engineman
Summerset Ry
Make Safety your first thought, Not your last! Safety First!