02-12-2015, 01:06 PM
Thank you Andy,
it is a good idea to move the connection where you did.
Although the runaround is shortened, it should still be long enough to do the switching.
I am still thinking about the best locations for the key operational elements.
- sorting tracks
- car float (replacing the staging)
- pier
- runaround
Hard to decide and a thing I might be able to plan 1:1 only.
it is a good idea to move the connection where you did.
Although the runaround is shortened, it should still be long enough to do the switching.
I am still thinking about the best locations for the key operational elements.
- sorting tracks
- car float (replacing the staging)
- pier
- runaround
Hard to decide and a thing I might be able to plan 1:1 only.
Stephan
Guys, if I don't bleed to death pretty soon, I'm gonna die of boredom.
Guys, if I don't bleed to death pretty soon, I'm gonna die of boredom.