04-28-2015, 09:07 PM
I started construction on the modules on the 21st of April and completed the basic modules on the 22nd of April. I now need to transpose the track plan to the plywood top and start gluing down cork. I will use HO scale for the mainline and N-scale cork for the rest of the tracks. I plan on using all Micro Engineering #6 switches and ME code 83 rail.
![[Image: Madras%2B1.jpg]](http://4.bp.blogspot.com/-VCGZz4Gqz0w/VTgN-Hn35UI/AAAAAAAABt0/G51FPs_3P9g/s1600/Madras%2B1.jpg)
![[Image: Madras%2B6.jpg]](http://4.bp.blogspot.com/-Th_sCzpU-iQ/VTgPWchsA3I/AAAAAAAABuU/JrhPHpNKZi8/s1600/Madras%2B6.jpg)
![[Image: Madras%2B1.jpg]](http://4.bp.blogspot.com/-VCGZz4Gqz0w/VTgN-Hn35UI/AAAAAAAABt0/G51FPs_3P9g/s1600/Madras%2B1.jpg)
![[Image: Madras%2B6.jpg]](http://4.bp.blogspot.com/-Th_sCzpU-iQ/VTgPWchsA3I/AAAAAAAABuU/JrhPHpNKZi8/s1600/Madras%2B6.jpg)
![[Image: Madras%2B9.jpg]](http://3.bp.blogspot.com/-Q2A4n13xkxw/VTvF2_BksMI/AAAAAAAABvA/5dTKcPdBqYc/s1600/Madras%2B9.jpg)