05-25-2015, 06:50 AM
Two areas get smaller updates
The triangle between the tracks and the surrounding had dark gray ground cover only. A green base cover has been applied and some more details like shrubs etc. will follow later. Some light ballst has been added too.
![[Image: IMG_4122_zpsunnmcybx.jpg]](http://i966.photobucket.com/albums/ae149/faraway52/FL2015-1/IMG_4122_zpsunnmcybx.jpg)
The background was dominated by two very similar warehouses. Both had been served with street running rails. I removed the left street running and the left building and will add ballast to the track. The old track was also not proper aligned making trouble to fit the background building. I corrected that error too. The new building will be smaller and there should be some space for a green background. Chris's layout Florida Springs is my inspiration.
![[Image: IMG_4123_zpsvdauyocv.jpg]](http://i966.photobucket.com/albums/ae149/faraway52/FL2015-1/IMG_4123_zpsvdauyocv.jpg)
Don't worry, just the usual incremental changes/improvements
The layout is currently operated by two Florida Central and two Florida Midland CF7 only.
The triangle between the tracks and the surrounding had dark gray ground cover only. A green base cover has been applied and some more details like shrubs etc. will follow later. Some light ballst has been added too.
![[Image: IMG_4122_zpsunnmcybx.jpg]](http://i966.photobucket.com/albums/ae149/faraway52/FL2015-1/IMG_4122_zpsunnmcybx.jpg)
The background was dominated by two very similar warehouses. Both had been served with street running rails. I removed the left street running and the left building and will add ballast to the track. The old track was also not proper aligned making trouble to fit the background building. I corrected that error too. The new building will be smaller and there should be some space for a green background. Chris's layout Florida Springs is my inspiration.
![[Image: IMG_4123_zpsvdauyocv.jpg]](http://i966.photobucket.com/albums/ae149/faraway52/FL2015-1/IMG_4123_zpsvdauyocv.jpg)
Don't worry, just the usual incremental changes/improvements

The layout is currently operated by two Florida Central and two Florida Midland CF7 only.
Reinhard