06-07-2015, 10:35 AM
Progress report for today's visit to club.The bridge fits like it was meant to. I got the roadbed glued down on the bridge (it will have a ballasted deck) and realigned the roadbed on the other end of the bridge.With a little bit of luck there will be a rough draft of the layout and basic track plan.The next major project will be getting the new track down and wired so we can run a train or two.
Johnathan (Catt) Edwards
"The Ol Furrball"
"I'm old school,I still believe in respect"
"The Ol Furrball"
"I'm old school,I still believe in respect"