06-25-2015, 12:11 PM
The little tower and the roof are permanent glued in place. Gates and the ramp added. Narrow corrugated steel roofs over the loading docks are next item.
![[Image: IMG_4209_zpsiqj94yic.jpg]](http://i966.photobucket.com/albums/ae149/faraway52/FL2015-1/IMG_4209_zpsiqj94yic.jpg)
Reinhard
Freelance 2015-1
|
« Next Oldest | Next Newest »
|
Messages In This Thread |