Freelance 2015-1
The structure is almost completed.
[Image: IMG_4212_zpstghwgaz4.jpg]

It must be integrated into the ground. The street running will be removed and the track ballasted. The ramp must join the ground.
[Image: IMG_4210_zps2zt87rvs.jpg]

The next major job is to fill the gap behind this structure right of the boxcar.
[Image: IMG_4211_zpsjyrqhnio.jpg]
[Image: IMG_4213_zpswfwpsue2.jpg]
Reinhard
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)