Freelance 2015-2
#23
Some switches and kits arrived. This would be one option. Arrange the warehouses in a 30° angle rail served. The tracks used for planning are 18' radius, the switches Atlas #4. At the ends my be LCL freight and teams tracks located. The parallel to the backdrop running tracks in the background will be removed. This track plan would ease the operation for me as everything is in access from the front.

[Image: IMG_4237_zpsitbi0yzs.jpg]
[Image: IMG_4238_zps5brorbwi.jpg]
Reinhard
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 2 Guest(s)