Small Stamp Mill
#32
I completed most of the basic ground cover today
[Image: DSCF5683_zpsenwwzfzi.jpg]
[Image: DSCF5684_zpsjewzvk3q.jpg]
I ran the mine waste to the left edge of the stamp mill before I glued in my two retaining walls. I filled in the gaps beside and below the walls with the same sealant I used to glue the track down. Just waiting for it to dry be fore putting ground cover down in those places.
I added Woodland Scenics earth blend to the taller mountain and the areas above the track as they wouldn't have had the waste dumping that the others below the track had. I'll be adding move variety when the glue dries.
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 2 Guest(s)