HO Grand Trunk 2-8-0 (Class D2)
#15
Question:

The running board on the engineer side is installed really low on the prototype. Would the running board be the normal width but hanging at a few inches from the boiler, or would the plating be full width against the boiler jacket?

Thank you.

Matt
Proudly modelling Quebec Railway Light & Power Company since 1997.

Hedley-Junction Club Layout: http://www.hedley-junction.blogspot.com/

Erie 149th Street Harlem Station http://www.harlem-station.blogspot.com/
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)