03-28-2009, 04:00 PM
Thanks Josh and Nick
Moving right along here, i finally got a good way to assemble and mount the chain-link fence material, so here are some pics of the fences, gates, and the first part of the parking lot for the "office", entrance through the guard gate and into the assembly plant and stamping plant docks, and the auto-loading ramps
As you can see, the gate for the "office" parking lot can open and close, but the gates for the entrance to the assembly plant and stamping plant docks cannot, they will always be in the open position. I can however raise and lower both sides of the small guard shack with the stop signs on them.... Next ill apply a smooth coat to the roads/parking lots to finish them off and paint them....
Off to the left in the first picture, you can see the beginnings of the Air Filter building that i am going to be adding onto the Assembly Plant
Moving right along here, i finally got a good way to assemble and mount the chain-link fence material, so here are some pics of the fences, gates, and the first part of the parking lot for the "office", entrance through the guard gate and into the assembly plant and stamping plant docks, and the auto-loading ramps
As you can see, the gate for the "office" parking lot can open and close, but the gates for the entrance to the assembly plant and stamping plant docks cannot, they will always be in the open position. I can however raise and lower both sides of the small guard shack with the stop signs on them.... Next ill apply a smooth coat to the roads/parking lots to finish them off and paint them....
Off to the left in the first picture, you can see the beginnings of the Air Filter building that i am going to be adding onto the Assembly Plant