03-30-2009, 02:30 PM
Ed and Ralph, thank you guys
I finished the Air Filter and Duct Work building for the Assembly Plant. Working with Resin pieces can be somewhat of a challenge, especially when the pieces dont quite line up right, maybe thats why Walthers never has re-released this kit. all in all its a nice detail, and if i could get my hands on another, i would buy it in a heartbeat. I payed $30 for this one alone lol
I also added chain-link fence around the Air Filter Building, and made a little space where i can add in some pallets, drums..... things like that. I added a working swinging gate in. I also added rails in for the Auto-Loading Ramps. They are now able to move back and forth, and either one of them will be able to service the middle of the 3 tracks these ramps will be loading auto-racks on
Thats about it for now, ill post some more when i get some more work done, but for now, here are some pics of what i just described above....
I finished the Air Filter and Duct Work building for the Assembly Plant. Working with Resin pieces can be somewhat of a challenge, especially when the pieces dont quite line up right, maybe thats why Walthers never has re-released this kit. all in all its a nice detail, and if i could get my hands on another, i would buy it in a heartbeat. I payed $30 for this one alone lol
I also added chain-link fence around the Air Filter Building, and made a little space where i can add in some pallets, drums..... things like that. I added a working swinging gate in. I also added rails in for the Auto-Loading Ramps. They are now able to move back and forth, and either one of them will be able to service the middle of the 3 tracks these ramps will be loading auto-racks on
Thats about it for now, ill post some more when i get some more work done, but for now, here are some pics of what i just described above....