03-16-2018, 04:48 PM
No one of which I'm aware, but feel free to follow through on that idea. I had thought about it for my own GERN plant, but all of the tracks for GERN connect directly to the main line, and any plant switcher would need to cross those tracks to get to the other sidings, so the local railroad does all the switching work for GERN at Port Maitland.
Wayne
Wayne