East Terminal & Newburgh
Hello,

thank you gents for the laurel.

And now (drum roll) :

[Image: dsc03681s9kj0.jpg]

[Image: dsc03682mdkxl.jpg]

[Image: dsc0368306jfh.jpg]
The insert for the first time on the layout. In think the new vegetation blends well into the existing one of the layout.




[Image: dsc036853kks7.jpg]
Next task was the crossing. Found a board with plank imitation. It looks alike the coarse stuff RR companies used in fomer times to fill the gaps between the rails at grade crossings. This is also a coarse cut and need adjustments.

I am thinking about the possibilities:
- Fixing it permanently and ignore the stuff in later eras when the bridge is mounted instead.
- A not permanet fixing of the fillings with magnets so that it can be removed by demand.


Lutz
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 3 Guest(s)