In order to determine the amount of shims I need to place under the bridges to reach the track I used double sided tape to attach the track to the thru girder bridge.
You can see from below how much is needed.
I used some leftover roadbed material and cardboard to fill in the gap.
Now I do the same for the two track bridge.
I remove the temporary shims and replace with 1/4 inch foam boards.
Trim the foam board to fit.
You can see from below how much is needed.
I used some leftover roadbed material and cardboard to fill in the gap.
Now I do the same for the two track bridge.
I remove the temporary shims and replace with 1/4 inch foam boards.
Trim the foam board to fit.