UP Elmwood Subdivision - N Scale Layout
#83
Last few weeks I've taken a break from the railroad to work some other side projects, so not much has been done it. Prior to the break, I did manage to put down some terrain in the river bed:

[Image: IMG_2484.jpg]

Yesterday though I decided to make some headway on getting more terrain down and get all this plaster cloth covered. So I started a "Batch A Day" routine, where I basically sneak off to the layout room while the wife gives our daughter a bath. I mix up batch of the Woodland Scenics Mold-A-Scene material and plop it down.

Here's what I finished today (left side foreground, still damp), and yesterday (left side background):

[Image: IMG_2485.jpg]

I figure with doing one batch a day, I can probably finish the lower level in about two weeks. I've kinda put the layout in a "financial holding pattern" (Especially after buying up those 6 locomotives these past few weeks), so some slow paced scenery work is just thing to work on during this time.

I'll post photo updates as the week goes on showing the progess.
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 2 Guest(s)