Help with HO Scale Helix design
#5
nachoman Wrote:1) how long do you expect your trains?

Hummm i guess thats a very important question lol. I suppose i would like to run trains down to the lower level between 10-20 cars.... All trains going down or up the helix would be pulled by 3-4 70 Tonners, 2 SW1500's, or 2 Genset locos, which is how the real M&ET moves freight on there tracks in the Beard Industrial District.


nachoman Wrote:2) what is the thickness of your layout base?

Im not sure yet, but im thinking ill be be using 1-2" blue foam. Most likely ill be sticking with the 1" blue foam, cuz thats what i can get (living in Cali) the stuff in the Tongue & Groove 2x8' panels. I might double up on the foam to make it a total of 2", i just dont know as of yet. Im thinking i would be fine with just 1" as the M&ET is on VERY flat land, and i have not seen much terrain except for minor changes around structures in such, in which i can just add foam below the layout/module and carve out.... So im going to say 1" foam for my base is going to be my final answer lol. 1" foam plus probably 1/2" ply if i use ply for the real base. I havnt decided on the actual construction of the layout section and the module sections yet....

If you need more info, i can certainly give it some thought and jot down my ideas about the construction of the layout and module bases....

Now the Free-Mo module bases would be a whole different story, but i dont plan on hooking any of the Free-Mo modules up to where the Helix would connect top and bottom levels so this shouldnt be so important right now.
Josh Mader

Maders Trains
Offering everyday low prices for the Model Railroad World
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)