An engine servicing facility for the JGL
Thanks Steve, Ed. Ed, I'm pretty sure Val has a link to her site in her sig, so there should be no problem finding those signs.

I did some work on the stairs and am attaching some pics. I have painted teh stairs after some rework, and have installed handrails on the step portion, still need to do the landings. I extended the wall but hate the way it looks so have decided to put a small wood structure between the steps and bldg, for storage. It will just be a front wall with a door and a tarpaper roof. I think it wll add visual interest. The second pic shows I still have some fitting to do. But I think it will work fine.

   

   
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 2 Guest(s)