An engine servicing facility for the JGL
As I was searching for the photo of the top mounted switch machines used in the post above, I came across some pics from earlier on in the construction of the engine facility scene. I thought I would take you back a bit, before teh roundhouse job. In order to lay my approach tracks for the turntable, i had to build the servicing facilities. This is the first shot I took, the ash conveyor is almost complete here, I had just built up the concrete foundation for it. The coaling tower was under construction as well. I thought it was neat to see how the area looked back then.

   

This is how it still looks today. I still need to install a ladder! This area will be next, after I finish the roof for the corp bldg.

   
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)