10-13-2009, 07:21 PM
I've slowly been making progress on my layout.
The first photo shows the progress of my town, all of the buildings need details such as window glass and signage, and I think that will wait until I decide exactly where they go and what they will be before I add those details.
The second photo shows the progress of my trackwork. I have the siding to the company store and the team track/station completes, as well as one run-around track. I still have one more yard track to complete, as well as the enginehouse, turntable, and smelter tracks. Unfortunately, I have to buy more rail before that happens. The good thing is I have enough trackwork done that I can play around with switching cars around and testing out the turnouts. So far, things have been working well. One turnout (the first one I made) needed an adjustment to the points, but it was no big deal.
Layout construction will likely slow, as Arizona is facing a significant budget shortfall (20% of the entire state budget)
. I work for the state Department of Water Resources, and that means a significant budget cut and as much as a 40% reduction in force, and cancellation of many state services and obligations. There is a serious chance I will lose my job on January 1st, and that has forced me to reduce my hobby budget to zero, and reduces my hobby time as I have to spend time looking for secondary income, part time jobs, or new long-term employment. Luckily, I have enough unfinished projects to keep me from going completely insane!
The first photo shows the progress of my town, all of the buildings need details such as window glass and signage, and I think that will wait until I decide exactly where they go and what they will be before I add those details.
The second photo shows the progress of my trackwork. I have the siding to the company store and the team track/station completes, as well as one run-around track. I still have one more yard track to complete, as well as the enginehouse, turntable, and smelter tracks. Unfortunately, I have to buy more rail before that happens. The good thing is I have enough trackwork done that I can play around with switching cars around and testing out the turnouts. So far, things have been working well. One turnout (the first one I made) needed an adjustment to the points, but it was no big deal.
Layout construction will likely slow, as Arizona is facing a significant budget shortfall (20% of the entire state budget)


--
Kevin
Check out my Shapeways creations!
3-d printed items in HO/HOn3 and more!
<!-- m --><a class="postlink" href="https://www.shapeways.com/shops/kevin-s-model-train-detail-parts">https://www.shapeways.com/shops/kevin-s ... tail-parts</a><!-- m -->
Kevin
Check out my Shapeways creations!
3-d printed items in HO/HOn3 and more!
<!-- m --><a class="postlink" href="https://www.shapeways.com/shops/kevin-s-model-train-detail-parts">https://www.shapeways.com/shops/kevin-s ... tail-parts</a><!-- m -->