12-19-2009, 09:02 AM
That gives you the best of both worlds. The three tracks are level and have the cross over and the step to the barge terminal is a very well visible divider. The steep grade for short cuts down to the barge terminal is not a problem at all.
Just an after thought:
How much is the barge terminal street level above the water level now? I think the top of the barge should be below the street level. That is not a must but is gives a more mature impression of the quay as quay walls of the prototype are mostly tall structures. e.g. this moderate quay wall http://www.ub.uit.no/baser/arkinord/deta...ge_id=1069
Just an after thought:
How much is the barge terminal street level above the water level now? I think the top of the barge should be below the street level. That is not a must but is gives a more mature impression of the quay as quay walls of the prototype are mostly tall structures. e.g. this moderate quay wall http://www.ub.uit.no/baser/arkinord/deta...ge_id=1069
Reinhard