12-29-2009, 11:08 AM
ngauger Wrote:Remove Old 1/4" Plywood Control panel
[ATTACHMENT NOT FOUND]
Install and wire New 1/4" plexiglass Control panel
[ATTACHMENT NOT FOUND]
Paint New Mountain (Right side) and prep both mountains for detailing
[ATTACHMENT NOT FOUND]
Get the Light (LED) on top of the tower to WORK again!!![]()
![]()
![]()
![]()
[ATTACHMENT NOT FOUND]
OK all done![]()
Now I have the "switching Panel" to replace and then i can begin detailing the mountains...
You might also think about lessening the grade on that "hanging chad" spur at the bottom of your third picture!
![Big Grin Big Grin](https://bigbluetrains.com/images/smilies/biggrin.png)