The Union Pacific Elmwood Route
#29
Finished up the track for the double track truss bridge. Since the track is going to be permanent inside the bridge once installed on the layout, I went ahead and did some weathering on the track now.

[Image: IMG_3765.jpg] [Image: IMG_3766.jpg]

After assembling the track with guard rails and side rails, I spray painted the whole thing Rail Brown. After that dried, I went back over the ties with a Floquil Rail Tie Brown pen and then finished up by cleaning the top of the rail with a brightboy. Turned out pretty well. Using the paint pens made painting the ties a breeze.
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)