03-24-2010, 10:28 PM
Maybe it has to do with me too. I'm pretty excited about having my building almost complete, so I am almost constantly thinking about the layout. Trackplan, uncouplers, turn-out controls, wiring, scenery, structures, operations. I have accumulated most of my materials for the electrical aspects on the layout - here is a photo of the huge mess in my workroom!
DIN rail, angle iron, wire, 3-way switches, relays, pushbuttons, terminal blocks, boxes, and packing trash, in addition to the normal tons of tools, rollingstock, paints, glue, rags, junk...
DIN rail, angle iron, wire, 3-way switches, relays, pushbuttons, terminal blocks, boxes, and packing trash, in addition to the normal tons of tools, rollingstock, paints, glue, rags, junk...
Three Foot Rule In Effect At All Times