06-24-2010, 03:46 PM
I think what I will do is keep the location and track-plan, but occasionally change back the the Seaboard Coast Line. CNW191 Seems to be doing the same thing with his layout and I figure It would give me the best of both worlds.
Anyway, sorry for the pause in construction, I will get back to building very soon!
Anyway, sorry for the pause in construction, I will get back to building very soon!
Justin Miller
Modeling the Lebanon Industrial Railway (LIRY)
Modeling the Lebanon Industrial Railway (LIRY)