06-27-2010, 04:14 PM
Ahh... The smell of solder.
I just started soldering the track yesterday and it was alot easier than I had imagined. I had my share of melted ties, but in that area of Miami broken track is probably pretty common. I have all of the turnouts soldered and I just need to solder the flex track sections and the curves and then I will be able to run trains!
I just started soldering the track yesterday and it was alot easier than I had imagined. I had my share of melted ties, but in that area of Miami broken track is probably pretty common. I have all of the turnouts soldered and I just need to solder the flex track sections and the curves and then I will be able to run trains!
Justin Miller
Modeling the Lebanon Industrial Railway (LIRY)
Modeling the Lebanon Industrial Railway (LIRY)