Another Miami Layout
Here is the Track-plan for the layout I will be building in a few months using pieces from the layout I bought.
[Image: CaliforniaOregonRR.jpg?t=1281220452]

I have included things to entertain me whatever my wants are, I have continuous running for those days I just want to run trains, I have easy and hard switching puzzles, and I have a Freight yard for sorting cars.

There are some thing in this plan I need the clarify, yes there is a switchback required to get to the bottom part of the layout, This was intentional as is makes it take longer to get between the two towns, extending the layout in operational terms. Second the Timsaver I have included is much less of a switching "Puzzle" than the original, the branch-line gives added operating room, and the object is to gather and replace freight cars, rather than rearrange them like in the original.

I will be building it modular with the 4x6, timesaver, and freight yard being the separate parts.
Justin Miller
Modeling the Lebanon Industrial Railway (LIRY)
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 2 Guest(s)