Using The ShipIt! Computer Program On An ISL
#30
How about this:

[Image: image.php?album_id=124&image_id=3482]

Divide the spur into two industries, one for the extra spots and one for the mill. The extra spots receive "grain 1" and ship "grain 2". The extra spots receive product "grain 1" from staging. There, "grain 1" is "unloaded" and then the empty car is "loaded" with "grain 2" at the empty spot. The feed mill receives "grain 2". So, the extra spots will ship grain 2 to the feed mill.

Only problem I see is that if there are no cars on the spur, a grain shipment would first be set out at the extra spot, then in the next session would go to the mill. To remedy this, perhaps the mill should also receive "grain 1" with a higher priority than the extra spots, so if the spur was empty, grain 1 would first go to the mill. It would only go to the extra spots if the mill already had a car there.
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 3 Guest(s)