2-8-2 - THE BUILD
#45
Thanks for the info, Doc. I was thinking of doing that with the CW pump, to install a more realistic pipe leading down and back towards the tender. I'll do the same with the generator to clear the cab.
I failed to mention in my previous post :oops: that Doctor W. has provided me with a wealth of information on the piping required for the FWH and other associated functions.... Thumbsup
Gus (LC&P).
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)