Backdrop at the Team Track
#20
The forum is killing me today. This is the third time to reply to this thread. When I hit submit, the forum tells me I am logged out, and I lose what I have typed.

phpBB Shoot

Gus, first I printed out the photos at the size I wanted, then taped all the photos together. Used a long straightedge to make sure all the buildings were level. There are over 20 photos in all, and the whole thing is around 6 feet long. Then I used a level to align the photos on the wall and taped them down. From that, I use a "measuring stick" to establish the major points of the buildings. The photo is an example. Once the major points are dotted in, they are connected together with a straight edge.

   

For vertical lines, I taped a yardstick to the wall, making sure it is level. Then a small draftsman's triangle is used.

   

Here is what I am working on today:

   
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)